Location: Salzburg, Austria

Purpose: Environmental technical supervision for the Salzburg Trade Fair buildings constructed over a former landfill.

Challenges: Preventing underground gas migration; periodic monitoring of soil-gas and groundwater.

Services Provided:

  • Planning and supervising the installation of degassing systems (HDPE liners, gas drainage).

  • Conducting risk assessments.

  • Performing recurring controls and monitoring (sampling, analysis).

  • Parameters Monitored:

  • Soil-Gas: Methane, CO2, H2S, O2.

  • Groundwater: Heavy metals, COD, HC, BETX, AOX.

Messezentrum Salzburg

Project Summary: Land Recycling of Military Site in Lower Saxony

  • Location: Lower Saxony, Germany

  • Project Goal: Repurposing of a former military casern site.

  • Activities:

    • Analysis of building pollutants and waste disposal for future occupants.

    • Systematic inspection of service halls, garages, office, and accommodation buildings.

    • Evaluation, sampling, and quantification of materials for classification and pooling into analog groups.

    • Development of environmental and procedural concepts for cost-effective, regulated deconstruction.

    • Soil investigations to evaluate potential underground pollution from former military use and contaminated fill.

    • Pile core drilling and analytical verification of soil samples.

  • Outcome:

    • Creation of tender documents, cost calculations, and waste disposal logistics.

    • Comprehensive planning for deconstruction, waste management, and new construction phases.

Land recycling of a military site in Lower Saxony

Project Summary: Oil and Groundwater Contamination Remediation

  • location:Austria Europe

  • Issue: Leakage of 20,000–30,000 L of transformer oil contaminating approx. 10,000 m² (4,000 m² of soil, 500 m² / 2000 m³ in the unsaturated zone).

  • Key Activities:

    • Multiphase investigation (percussion drilling, groundwater monitoring wells).

    • Determination of current and historical groundwater currents.

    • Preparation and implementation of a remediation plan.

  • Remediation Approach:

    • Hydraulic In Situ-remediation:

      • Soil washing in the unsaturated zone using 55 infiltration pipes, clean groundwater, warm water (solar-heated), and H₂O₂.

      • Pump & Treat: 3 groundwater remediation wells with oil phase removal in 3 wells and 3 stand pipes.

      • Remediation container with gravel and activated-carbon filters.

      • Water leaching via drainage shaft.

  • Oil Recovery: Approx. 12,000 L of transformer oil recovered.

  • Remediation Duration:

    • Initial investigations (2002–2004).

    • Remediation equipment installed (July–Nov. 2007).

    • Operation ongoing since Nov. 2007; remediation expected to last 5 years.

  • Services Provided:

    • Percussion drilling, groundwater monitoring, hydraulic soil washing,

    • Pump & Treat, remediation container installation.

Transformer Oil Remediation